Adjusting the track position.
Garage door installation track level.
Then they ll go horizontally parallel to the garage ceiling and floor.
Using a rubber mallet tap the bottom of the track so it is perfectly.
So if they drop the horizontals make sure they drop the opener too.
If the garage door is secured in the tracks loosen the screws with the help of a screwdriver which will bind the tracks in the garage door frame.
Often referred to as dual track it is best recognized by a second horizontal track.
The door runs are housed in a garage door track one on each side of the garage door.
Vertical tracks must be level with each other for the door to function properly.
Vertical tracks must be plumb as well.
If not level raise the lower track but not higher than 3 8 from the floor figure 7d.
Install the weatherstripping onto the bottom edge of the bottom door panel.
Maintain 3 8 space between the door edge and the vertical track figure 7c.
Unless you have a carriage style garage door your garage door will have two door runs that move from the floor to the ceiling.
Loosening the track screws.
Place the hinges.
The bottom of the track must be equal to the bottom of the section.
This second track is installed above the horizontal section that is attached to the curve from the vertical track section.
The installation process varies by.
Adjusting the tracks for a binding garage door step one.
The rail on the opener should be slightly higher in the front and about 2 3 inches above the door when the door is open.
Attach the brackets for the cable to the bottom door panel following the manufacturer s instructions regarding the.